|
|
| |
|
News 61 White Color IP 4 HDPE Duct
White colored ducts get more and more specified for projects
in hot destinations, versus standard black colored ducts.
Temperature tests show up to 15°C lower duct temperature
during installation in summer and by this ducts keep higher
performance in longitudinal and lateral load performances
specially required during duct installation.
White PESTEC IP 4 ducts are uv-stabilized and heat stabilized
to keep their properties either by outside storage until use. |
 |
|
 |
|
|
| |
|
News 60 Machined Fittings
PESTEC provides huge variety of customized non standard
fittings machined from hollow rods, pipes or sheets.
Multiple materials and colors are available.
Machining of OD, ID thickness, holes, screw threads,
trapezoidal gauges, grooves, slots, channels, radii and more
are possible. |
 |
|
 |
|
|
| |
|
News 59 DHP HDPE Half Pipe used for Repair in Singapore
DHP HDPE Pipes including heat shrink wrap sleeves have been
successfully used for external tendon repair inside a box girder
in Singapore for long term tight and protective solution.
Easy, fast and professional application. |
 |
|
 |
|
|
| |
|
News 58 IP 4 Duct FDOT Raw Material Compliance Test passed
PESTEC passed ASTM D 4101 cell class 340PP55662 raw material test
complying with FDOT spec for IP 4 PP ducts used in
internal PT applications.
The test was performed at independent ARDL Lab in the USA.
View content: TR 280-20-1 IP 4 PP Duct FDOT RM Compliance.PDF
|
 |
|
 |
|
|
| |
|
News 57 New Colored Heat Shrink Pipe
Heat shrink pipes are now also available in colored version
e.g. white, so following architecture design requirements
for visible constructions. Technical properties remain the same as
black heat shrink pipes. On request colored heat shrink pipes
are available with similar uv-protection as our NOCX pipes.
Heating of colored heat shrink pipes is recommended using
a heat gun instead a flame gun to avoid colored fire spots.
Final shrinkage result is the same, just shrinking time is little longer.
|
 |
|
 |
|
|
| |
|
News 56 Grout Port Stress Test passed
PESTEC passed ASTM F 2136 Notched Constant Ligament
Stress Crack Test min 65 hours complying with FDOT for
PESTEC PP grout ports and 20 hours for PF PE couplers.
The test was performed at independent TRI Lab in the USA.
View content: TR 254-19-1 PP Grout Port Stress Crack.PDF |
 |
|
 |
|
|
| |
|
News 55 Heat Shrink Pipe Selection Guide List
PESTEC present a new selection guide list for heat shrink sleeves
and pipes showing suitability for the different applications.
View content: TI 920-1 HDPE Heat Shrink Pipe Selection Guide
List.PDF |
 |
|
 |
|
|
| |
|
News 54 Independent Expert Review on NOCX pipe UV-Test Results
PESTEC present an independent expert opinion on the reliability of
the different accelerated laboratory weathering tests executed on
PESTEC NOCX ducts during last 20 years.
In addition the author comments on PESTEC durability predictions
and color recommendation charts.
See detailed report: Independent Expert Review of weathering results |
 |
|
 |
|
|
| |
|
News 53 New Grout Port Drill Tool for small sized Ducts
PESTEC offer new drill tool to be used for all size of PT ducts
including small size ducts.
|
 |
|
 |
|
|
| |
|
News 52 New IP 4 Duct Size 36/46 mm for 3 strands round
PESTEC introduce new IP 4 Duct Size 36/46/2.0 mm to use for 3 strands
round where no flat duct can be used.
All accessories like PF and PFS couplers are available and also still our
grout port system works for this small duct size.
Ducts also can be connected by butt welding using our IP 4 butt welding
equipment.
Of course ducts comply with FIB 7 and PTI specifications.
PESTEC also prepares for new IP 4 Duct Size 44/54/2.0 mm to use for
4 strands round. |
 |
| |
 |
|
|
| |
|
News 51 New Inflatable Rubber Hose
PESTEC introduce new Inflatable Rubber Hoses to use as temporary
internal bonded PT pipe stiffener during concreting of segments and
structures designed in sizes. where concrete load can not anymore
taken by the plastic duct themselves.
Inflatable Rubber Hoses are available in sizes 25-250 mm with wall
thickness of 8-15 mm. They are expandable 15-25 mm depending
on size and may be used for min 200 times at max elasticity.
Max available length is 30 m and hoses include steel end cap at one
end and end cap with automotive tire valve to fill with 3-4 bar air at
the other end. |
 |
| |
 |
|
|
| |
|
News 50 118.000 m IP 4 Duct for Diaphragm Wall PT in Dubai
PESTEC has started to supply 118.000 m IP 4 duct system contract for new
Canal link to Dubai Creek constructed by diaphragm wall cages strengthened
by internal bonded PT method.
The new system consists of 100/116 mm ducts, heat shrink pipe and
steel bends.
The total installation period is estimated for 16 month. |
 |
| |
 |
|
|
| |
|
News 49 New SB 4 Coupler For Precast Segmental Bridges
PESTEC introduce our SB 4 Coupler System for pressure and corrosion
tight plastic duct connection of internal bonded post tensioning tendons
in pre-cast segmental structures.
Our SB 4 coupler available in HDPE or PP comply to FIB 7 specification
and is designed to cover a maximum segment to segment installation
tolerance of 50 mm caused e.g. by part tolerances, duct elongation,
temperatures, pipe cutting and welding or formwork and segment to
segment gap.
Suitable for corrugated PESTEC IP 3 and IP 4 ducts for internal PT and
smooth PESTEC EP ducts for external PT. Also suitability with other
corrugated ducts for internal PT upon request.
SB 4 coupler systems consist of 2’Outer Couplers’, 1’Inner Coupler’,
1 Sealing No 1, 1 Sealing No 2, 2 end caps for temporary and multiple use.
All PESTEC IP 4 duct sizes ID 58 – 140 mm are available.
Other sizes on request.
PESTEC offers several options for SB coupler delivery either prefabricated
segment ducts on final length consisting of IP 4 duct including mirror
welding of ‘Outer Couplers’ or just the couplers separately for site welding.
Delivery of ducts in standard lengths and SB couplers separately for site
Welding.
See detailed information: SB 4 Coupler Data Sheet.pdf
|
 |
| |
 |
|
|
| |
|
| News 48 Huge Raw Material Price Increases
Following the crude oil price increase during last months the crude oil based
ethylene as the basic material of polyolefin raw materials like HDPE and PP
pressure pipe grades increased by 34% since February 2008.
Most PESTEC products are made of these materials to comply with
the application specifications and standards.
Due to worldwide limited suppliers offering pressure pipe grade raw materials
sales prices are very similar and so are not subject to the high competition
of mass PE grades like for packing and foils.
For this reason and our experiences, even if the oil price may drop again,
we expect more or less stable prices on this high level in the near future. |
 |
| |
 |
|
|
| |
|
| News 47 New PESTEC Branch Office in New Delhi - India
PESTEC established a branch office in New Delhi, India under
the name of PESTEC India PVT. LTD.
The staff will cover the project management for local India projects
as well manage PESTEC products production facilities in India.
Pricing and technical support either for India clients will be still
offered from German office.
(Picture of Taj Mahal is presented with a thank you to India and not
showing PESTEC India new office location.) |
 |
| |
 |
|
|
| |
|
News 46 120.000 m EP 1 Duct System for Jebel Ali Palm Bridge
in Dubai
PESTEC has started to supply 120.000 m EP 1 duct system contract for new
Jebel Ali Palm Main Bridge constructed by external post-tensioning method.
The system consists of 140 mm ducts, expansion sleeves, heat shrink pipe
Couplers, grout port welding system and vent pipe fittings for injection.
The total installation period is estimated for 14 month.
EP 1 Duct system approval according to FIB. |
 |
| |
 |
|
|
| |
|
News 45 New ultra high pressure pipe up to 150 bar
PESTEC introduce new UHP HDPE pipe for ultra high pressure up to 150 bar
For use in water injection, oil well hook-up lines, flow lines in buried, offshore
Onshore/under water installation or gas distribution.
UHP pipes consist of a 3 layer system of inner HDPE PE 100 liner, mid layer
of synthetic fibre and cover layer of uv-stabilized PE 100 material and are
available in 3 types UHP-S, UHP-M and UHP-L depending on pressure rate and
medium temperature.
UHP pipes are available in sizes ID 100 and 125 mm, supplied in 400 m coils
and connected by special couplers and flanges.
The advantages are more easy, efficient and effective installation of
up to 1000 m/day either offshore or onshore, high flow capacity due to lower
friction, so 5’ pipe has same flow rate than 6’ steel pipe and of course the well
known fully corrosion resistance.
Max service pressure and temperature depend on flow media in ranges
for water 36-150 bar, for hydrocarbon fluids 26-65 bar and gas 25-42 bar.
Offshore installation depth depending on media 65-900 m under water.
UHP pipes are produced according several international standards and are
Also certified from several institutes. |
 |
| |
 |
|
|
| |
|
News 44 Material Safety Data Sheet for HDPE products
PESTEC present latest MSDS for HDPE products with
the intention to provide Health and Safety information
mainly for the case of fire.
Even if HDPE is not regulated as hazardous or dangerous good
for any kind of transport, storing or for installation, and so can be
handled without any special care we want to inform about
Emergency and First Aid measures as well as Fire and Explosion
Hazard Data of this material.
View content: HDPE MSDS. PDF |
 |
| |
 |
|
|
| |
|
| News 43 New Leak Tightness Test Set
PESTEC introduce new Leak Tightness Test Set suitable to
test leak tightness of duct and pipe systems installed for
various applications.
The set is suitable to tests pipe ID 70-150 mm (3-5 inch)
with both smooth or corrugated inner surface design
for max 0,25 bar (3,5 PSI) according EN 1610 or
FIB Bulletin 7, Chapter 4.2 Clause 2.
The ‘all in’ test equipment set consists of a pneumatic dead end
and a bypass plug to be inflated by an included compressor, filling air
with 7,5l/min at max. 11,5 bar, an equipment adaptor including
air outlet and a digital pressure gauge test equipment
(resolution 1,bar.
The Leak Tightness Test Set is available for rent and sale.
|
 |
| |
 |
|
|
| |
|
| News 42 IP 4 Duct Full Scale Test
54 m long and 2,65 m high Full Scale Test has been
successfully performed with big sized
ID 130 mm IP 4 M PE Ducts.
4 Tendons 6-43 have been concreted, grouted and stressed
and all results for friction, wobble, tightness, loads and
filling grade have been within the required and specified
FIB 7 and TR 47 values.
|  |
| |
 |
|
|
| |
|
| News 41 HDPE Welding Rod with new packing PESTEC HDPE PE 80 and PE 100 welding rods now are
packed on environmental friendly paper drums additional
thin plastic protection foil.
2,4 Kg round profile welding rod is available in 3,4 and 5 mm
on our new drums.
Paper drum sizes remain unchanged to fit to welding supports
as before and can get environmental friendly and easy waste,
so special plastic disposal like for previous plastic drums can
be avoided. |
 |
| |
 |
|
|
News 40 ETA – ETAG 013 Application for IP 4 Ducts
PESTEC applied for ETA approval of our IP 4 Duct for use
in internal bonded post-tensioning structures.
As according ETAG 013 regulations ducts are only part of
the complete system and so do not cover the approval of
plastic ducts alone, PESTEC applied for an individual so
called ETA approval of our IP 4 ducts.
Due consents of all EU members are required the duration
for the approval is assumed to take 6-9 month. |
 |
| |
 |
|
|
| |
|
News 39 Pipe Surface Cleaning Methods
PESTEC presents a new recommendation for possible
pipe surface cleaning processes depending on kind of
contamination materials and grade.
View content: Pipe Surface Cleaning Methods. PDF |
 |
| |
 |
|
|
| |
|
| News 38 Quality PVDF pipe and fittings for lowest market price
PESTEC proudly introduces new PVDF liner and pressure pipe systems.
We use original state of the art Kynar resin from the market leader
Arkema – USA to produce first class PVDF pipes and fittings
according ISO 10931-05 and quality approved to be Kynar labled
from Arkema.
Sizes OD 20 to 200 mm for lining and for pressure applications PN 10
and PN 16 are available.
To complete the pipe system all standard fittings like elbow 90°,
equal tee, socket, reducer, end caps and valves are on stock and
special fittings are available on request as well known from PESTEC.
Each pipe is individually wrapped in foil and perfect packed to avoid
transport damages.
Last we announce the biggest advantage of PESTEC PVDF pipes:
We offer lowest market price approx. 15% lower than our competitors.
Challenge us !!!
|
 |
| |
 |
|
|
| |
|
| News 37 New IP 4 Duct Butt Welding Equipment
PESTEC introduces the brand new IP 4 Duct Butt Welding Equipment P 160
for fast and easy butt welding of our IP 4 ducts.
The low weight very portable all in one equipment with a weight of 27 Kg
only
includes all special clamp sizes for all IP 4 ducts 74, 92, 116,131,146 and
157 mm.
Both materials HDPE and PP and also all available IP 4 duct wall thicknesses
can be weld together based on international welding norms.
Of course planar and heating element are also included and the equipments
work
at standard 220-230 Volt.
The IP 4 Duct P 160 Butt Welding Equipments are available to purchase
or on rental basis. |
 |
| |
 |
|
|
| |
|
| News 36 115.000 m IP 4 Duct for Bangalore elevated Expressway
PESTEC has started to supply first quantities of total 115.000 m IP 4 100 mm
duct
for new Bagalore elevated Expressway constructed by segmental bridge
method.
The pipes are supplied in fixed length and connected using our PF couplers
and the total installation period is estimated for 14 month.
IP 4 Duct approval according to Indian IRC 18 was achieved by
verification
tests. |
 |
| |
 |
|
|
| |
|
News 35 PESTEC connected VOIP
PESTEC now also to reach VoIP by Skype. Contact us under:
Pestec.Holger.Jung
and save communication costs with us.
|
 |
| |
 |
|
|
| |
|
News 34 Longest USA Stay Cable Bridge approaching
‘In harmony
with nature’
PESTEC NOCX pipes will be used on new Audubon Bridge crossing Mississippi
river near Baton Rouge in Louisiana.
More than 20000 m stay cable pipes for the 482 m main span bridge with the
2x
153 m pylons are needed.
Owners and designers approach is to design the bridge similar to the
approach of 19th century local residing, very renowned artist
John James
Audubon, who dedicated his life to paint all of the birds in America
also valuing smallest details and their relationship to the surrounding
environment.
Mr. Audubon inspired the engineers to the goal to ensure the bridge is
not built in a vacuum, so rather to get an integral part of the surrounding
landscape.
So the theme selected for this project is ‘In harmony with nature’.
The stay pipe color is burnt umber, a common color found in the birds native
to this area and has the advantage to be even visible to the travelling public
against cloudy or hazy sky, so at all weather conditions.
PESTEC is proud to supply their NOCX pipes for this bridge
‘In harmony with nature’.
|
 |
| |
|
|
|
| |
|
News 33 New FR 1 PP pipe system to comply with highest
fire
resistance
class
PESTEC introduce the fire resistant FR 1 PP pipe with outstanding properties as
the first real plastic option to cast iron, e.g. to use for drainage and sewage
in public and private buildings, sanitary, aggressive fluids or in outside use like
drainage of bridges and roofs.
The pipes are made of advanced self-extinguishing PP and have been classified
to fire behaviour index Euro class B1 acc. EN 13501-1:2002 means for low
contribution
to spread fire.
Smoke production index is S3 means average level of smoke production and
Burning droplets index is d0 means absence of burning particles.
The material properties provide highest strength even at lowest temperatures,
high
resistance against impacts and atmospheric agents and of course all other
well known excellent properties of Polypropylene.
A side effect is also the outstanding sound absorption.
The pipe system is available in sizes 58-200 mm and pipes and complete
fitting
variety are supplied with a Push Fit Coupler including a new double lip
seal
with
perfect hydraulic properties.
|
 |
| |
|
|
|
| |
|
News 32 New ultra low friction ULF Duct for Fibre Optic Cables
PESTEC introduce improved ultra low friction HDPE duct for fibre optic cable
Protection.
The friction coefficient of the new inner layer has been reduced to outstanding
low < 0,06 between sub-duct and cable using an improved inner silicon layer.
The advantages are more easy, efficient and effective installation of fibre optic
cables
stress reduction of the cables and possible longer installation lengths with
less duct
connectors needed and faster installation with less manpower.
The general duct design keeps the same with co-extrusion layer of high quality
HDPE material with excellent long-term properties outside and the new
solid wall special low friction silicon layer inside (minimum 10% of total wall
thickness).
Also the sizes remain the same with OD 32, 40 and 50 mm.
Coil length 500 – 1000 m.
Various colours are available according request.
|
 |
| |
|
|
|
 |
|
| News 31 New IP 4 Duct for bonded post-tensioning available now
PESTEC introduce new IP 4 Duct for bonded post tensioning.
The design is very similar to our IP 3 duct and meets latest FIB 7
specifications.
The sizes are slightly modified, so now we offer e.g. 100/116 mm,
115/131 mm. 76/92 mm and 58/74 mm.
IP 4 Duct is available in HDPE and PP and also in different wall thickness’
to
comply with all kind of project specification as well as our clients
economical
target.
All kind of components well known from IP 3 are also available for IP 4.
FIB7 and FDOT tests are prepared for execution during the next 2 month,
and
due to successful IP 3 Duct test we trust to pass also with the new IP 4 duct.
A new production line with big capacity for IP 4 duct has been established in
India. One big advantage now is the very short production lead time of just
1 week, so in the future we can also serve projects within delivery times of
approx. 4 weeks depending on the location.
First 115000 m order of size 100/116 are in production for
Bangalore
Expressway.
|
 |
 |
|
|
|
 |
|
| News 30 New Rubber Material for Exposed Use in Civil Structures PESTEC introduce advanced PUR HMD polyurethane quality optimized
for hydrolyse resistance microbe-resistance, low temperature resistance
by also absorbing dynamic stresses in outdoor use.
First advantage is a new production technology for this material needing
More simple tools only and so saving high injection tool costs as needed for
other material. Either small quantities of individual shapes, e.g. like
for stay cable boots, now can be offered for affordable prices.
Second advantage is the availability of a big variety of colors.
Compared with CR – polychloroprene (common brand name Neoprene)
and CSM – chlorosulfonated polyethylene (common brand name Hypalon)
our PUR HMD material provide excellent weather resistance in black color
and good weather resistance in other colors where CR and CSM only reach
medium to good results.
While wear resistance of PUR HMD is better, all other mechanical properties
like tensile strength, aging, ozone, abrasion, temperature range and
compression set are very similar with CR and CSM.
|
 |
 |
|
|
|
 |
|
| News 29 Gel-Epoxy for Perfect Corrosion Protection
PESTEC’s Visco elastic gel of epoxy polymer is an invention for long term
corrosion protection of high performance materials in civil structures.
The material has been successfully used on several projects e.g. for stay cable
anchor protection.
Special formulated Gel Epoxy resin and hardener components are mixed at
ambient temperatures, easily injected to smallest cavities because of it’s
high viscosity ( like water) with low pressure during 12-24 hours and
cross linked during polymerization to a visco elastic polymer with
adhesive properties as well as damping properties to the system.
Perfect corrosion protection has been approved by several tests,
e.g. 3 month exposure in salt spray test and salt-water immersion test
as well temperature test. In addition PESTEC Gel Epoxy provide excellent
alkaline resistance during 6 month cement grout compatibility test and
excellent mechanical behaviour in cycle thermal test.
It was further approved to stop started corrosion at it’s level.
Other benefits are volumetric material shrinkage, no material diffusion to
other materials and no temperature increase during polymerization. |
 |
 |
|
|
|
 |
|
| News 28 Wind Tie Connectors for Stay Cables
PESTEC supplied special connectors in pipe color to connect additional
wind tie rods to NOCX HDPE stay pipes for a project in the USA.
The wind tie connectors are made of same colored HDPE material and supplied
in half shells to be attached at final optimized position by integrated
electro fusion welding method already well experienced for a lot of other
components as well as repair parts for stay cables
The design has a groove to take the metal steel clamp of the tie rod for
perfect function as well as good appearance for the whole cable.
|
 |
| |
|
| |
|
| |
|
 |
|
|
|
 |
|
| News 27 Raw Material Prices stable on high level
Following the crude oil price increase during last months the crude oil based
ethylene as the basic material of polyolefin raw materials like HDPE and PP
now seems to keep stable on high level.
Raw material suppliers already set up prices by 25% from starting this year
and currently do not announce further increase.
The ethylen cracker capacities are back to full operation, but due to high
demands we expect stable prices for next half year by no price decrease
in the near future.
|
 |
| |
|
| |
|
| |
|
 |
|
|
|
 |
|
| News 26 Glossary of HDPE Pipe terminology
PESTEC present a glossary of terms with the intention to provide
definitions for specific words and expressions currently used
by the plastic pipe industry or are related to the manufacture,
installation and use of polyethylene pipe for different applications.
View content: Glossary of HDPE Pipe terminology. PDF
|
 |
| |
|
| |
|
| |
|
 |
|
|
|
 |
|
| News 25 Dark Blue Metallic Effect colored NOCX pipes
New dark blue metallic effect colour has been chosen to underline
the bridge design and durable protection of the stay cable structure
of a bridge in the Czech Republic.
PESTEC also provides the HDPE system components in the same
color to complete the system.
Since a couple of years more and more bridge designers go for
metallic effect colors like silver or gold and now blue.
Our experiences, references as well as our outstanding uv-test results
either for metallic effect colored NOCX pipes convince the
project designers, project engineers as well the subcontractors to
decide for metallic effect color.
Thanks to our customer for this contract !!! |
 |
| |
|
| |
|
| |
|
 |
|
|
|
 |
|
| News 24 White DHPS Half Pipes for Stay Cable with Fire Blanket
First use of our DHPS Half pipes with incorporated longitudinal sealing
for a project in La Reunion with special fire protection requirement.
Half pipe color will be white. PESTEC uses the same well developed and
tested white NOCX color we also used for several projects for solid pipes.
Our Half pipes will be installed over the bundles of HDPE coated strands
which are covered with special 10 mm double layer fire protection blankets.
The fire protection blankets did pass the required 1000 °C hydrocarbon
fire test with a duration of 1 hour by keeping the steel strand temperature
less than 100°C.
Installation will be made by pressing the half pipes together and using our
click system and lock them in position. Full strength radial joints are secured
by butt welded using our special half pipe butt welding equipment.
To complete the system, special components to connect the half pipes to
pylon and deck will be supplied from PESTEC.
Our experiences and references convinced the project designers and
project engineers to choose our half pipes for this special application. |
 |
| |
|
| |
|
 |
|
|
|
 |
|
| News 23 Information on new UV-Test
PESTEC present updated detailed test information on a uv-test called
SEPAP and which we noticed in some project specifications in the past.
Focus is the prediction of long term polymer stabilization based on
extreme short time acceleration.
We did test our NOCX pipes in this test 2 times in the past and
due to the partly different test results versus our standard Xenotest
and WOM tests we searched for the reasons therefore.
SEPAP test did not reach international acceptance up to now and has
not been approved from experts for an international norm.
Main reasons seem to be the use of non-natural light radiation with
very high energy causing molecule absorptions, polymer and
additive damages and excessive polymer oxidation.
See detailed information: SEPAP Test Information. PDF
PESTEC propose to stay with the reference standards Xenotest and
WOM Tests according international accepted ISO and ASTM norms
as reference tests for accelerating photo-aging test for
long term uv-stability prediction of HDPE pipe products. |
 |
| |
|
| |
|
 |
|
|
|
| |
|
| News 22 Review on FIB 2006 Congress PESTEC thank you for visiting our exhibition stand on second FIB 2006
Congress in Naples. It was a pleasure to meet you to show our
new products, to discuss product details or just to have an espresso
with you.
Your interest in our actual product range for stay cable protection,
external and internal post-tensioning applications as well as ground
anchor protection and your expressed satisfaction that we provide
complete systems including detailed technical support motivate us to
proceed with our philosophy.
Your given ideas will support us on detail improvement in the future.
PESTEC look forward to our customers and interested people
challenges on future projects. |
 |
| |
|
| |
|
| |
|
|
|
 |
|
|
|
| |
|
News 21 FIB 2006 Congress Naples - Italy
PESTEC invite all our customers as well as all interested people
in our products to visit our exhibition stand for a small and strong
Italian espresso coffee on second FIB 2006 congress in
Naples/Italy from 5-8th of June.
We are going to present our actual product systems variety for
stay cable protection, external and internal post-tensioning
applications as well as ground anchor protection.
PESTEC look forward to meet you and discuss detailed
production information.
|
 |
| |
|
| |
|
| |
|
|
|
|
|
 |
|
News 20 New CIC 4 HDPE Ground Anchor Duct
After introduction of CIC 3 flat corrugated design anchor duct
just 2 months ago now we introduce as well our new
CIC 4 HDPE ground Anchor Duct with new thick wall circular
high corrugations and improved bond behaviour for excellent
corrosion protection of permanent ground anchors.
Our new CIC 4 HDPE Anchor Duct is available in a wide size range of
ID/OD 38/50 to 148/175 mm.
The duct is available in wall thickness classes 1,5 and 2,0 and 2,5 mm.
CIC 4 HDPE Ground Anchor Ducts have standard straight length
of 5,8 m and in sizes up to 100 mm either in coils up to 100 m.
Other lengths on request.
Jointing is recommended with heat shrink sleeves.
|
 |
|
|
| |
|
| |
|
|
|
 |
|
News 19 New FKS PEG Pressure Pipe
New extra large diameter HDPE pressure pipe for main application
of raw and potable water supply.
The development of a new HDPE raw material compound containing
fibre snippets enables us to offer the unique
FKS PEG Pressure Pipes which are available in sizes
1000 – 4000 mm for pressure resistance up to 10 bar in
stiffness classes 2 – 12 SN according ISO 9969.
FKS PEG Pressure Pipes have solid wall and smooth inner and
outer surface ensures best hydraulic properties and the outstanding
HDPE properties ensure best chemical resistance and low abrasion.
Our new FKS PEG Pressure Pipes are jointed with the
well-established electro-fusion socket.
All kind of fittings as bends, elbows, reductions and flanges
are available.
The production is based on the well experienced
FKS profile pipe production.
|
 |
|
|
|
|
 |
|
News 18 New CIC 3 HDPE Ground Anchor Duct
New corrugated HDPE Duct for excellent corrosion protection of
permanent ground anchors.
New circular flat corrugation design in common anchor sizes of
ID/OD 54/64, 68/78, 89/98 mm.
Wall thickness available in 1,5 and 2,0 mm.
CIC 3 HDPE Ground Anchor Ducts have standard straight length
of 5,8 m or are available in coils up to 200 m.
Other lengths on request.
Jointing is recommended with heat shrink sleeves.
We produce our new CIC 3 Ducts in Europe, so delivery time
is just about 2 weeks.
|
 |

|
|
|
|
News 17 New PFS Sealing for IP-3 Duct PFS Couplers
New PFS sealing design for improved PFS coupler tightness
on IP-3 duct system.
The sealing is designed to clamp the IP-3 duct in perfect position,
so pipe removal is possible using a special removal tool only.
Tightness tests acc FIB recommendation bulletin 7 for air tightness
of 0,3 bar for minimum 5 minutes have successfully passed
without loss.
So the PFS coupler is offered as a good option for the tight
Connection of our IP-3 Duct in internal Post tensioning
applications and might save the installation costs and installation
time of additional heat shrinks sleeves or heat shrink pipes.
|
 |
|
|
|
|
| News 16 Orange DHP Half Pipes for China Stay Cable Bridge
We proudly announce the supply contract for Nan Chong Cable Stay Bridge
in China now built using PESTEC DHP Half pipes in orange colour.
PESTEC also provides the special half pipe welding equipment and
spacer system to complete the system.
Our experiences and references convinced the project designers and
project engineers to use again our half pipe system in China.
Thank you to our customer for this contract !!!
|
 |
|
|
| |
|
|
|
News 15 Stay Pipe Repair Coupler systems
Swinging cables during high wind crashed against street lamps on
Dubrovnik Bridge, Croatia and smashed the NOCX-HDPE pipes in
About 10 m height in sections of about 60 cm.
The smashed sections were carefully cur out using a special circular
saw with adjustable height to avoid cutting into the inner
HDPE coated strands and our special electro fusion half pipe repair
couplers of same stay pipe colour were successfully installed
Our repair coupler system is designed to replace the original stay pipe
section by taking the same calculated loads of pipe and welding forces.
|
 |
|
|
| |
|
|
|
News 14 South Africa goes for IP-3 M PP Duct
First delivery of plastic duct for internal Post-tensioning in South Africa for
about 11000 m of IP-3 M PP have been delivered for Uli-Ilangeli project.
Pipe connections were made using PF couplers.
IP 3 Duct approval was achieved by meeting the strict project requirements.
|
 |
|
|
News 13 Increasing Raw Material Prices
Following the crude oil price increase during last months the crude oil based
ethylene as the basic material of polyolefin raw materials like HDPE and PP
increase by nearly 20% during the last 3 month.
Raw material suppliers already set up prices by 15% by end of September
and allready announced another 10% for October.
The ethylen cracker capacities are still limited versus demands,
so price decrease in the near time cannot be expected.
Since the raw material part of the final PESTEC product sales price
depend a lot on the kind of production, the necessary price increases
vary for each product line.
To support our customers as much as possible for their tenders
and projects by lowest possible price increases, PESTEC will limit them
to the raw material part only.
PESTEC apologize for the need to limit the validity of new quotations
to 1 month from now on until the market will relax again. |
 |
|
|
News 12 Silver coloured NOCX pipes for Green Bridge in
Brisbane Australia
We proudly announce the supply contract for 2nd biggest Cable Stay Bridge
in Australia now built in Brisbane using PESTEC NOCX pipes in
dark silver metallic effect colour and of course including the state of the art
feature of external helical ribs.
PESTEC also provides the HDPE system components as transition pipes,
coloured electro fusion couplers as well as the neoprene boots
to complete the system.
Our experiences, references as well as our outstanding uv-test results
either for metallic effect coloured NOCX pipes convinced the
project designers, project engineers as well the subcontractor to go for
the dark grey metallic effect colour to underline the bridge design and
protect the structure on long term at the same time.
Thank you to our customer for this contract !!!
|
 |
|
|
News 11 IP 3 S-PE Duct for Thread Bar Protection in
Abu Dhabi - UAE
To protect Thread Bars in post tensioning on Sheikh Zayed Bridge to
Abu Dhabi Island nearly 10000 m of PESTEC IP 3 S-PE Ducts are going
to be used.
Thread bars of 32, 40, 50 and 75 mm will be protected with IP 3 S-PE Ducts
in sizes up to 114/99 mm.
To complete the corrosion protection system, PESTEC heat shrink couplers,
corrugated pipes to cover the thread bar couplers and special PE reductions
including grout ports will be used.
IP 3 Duct approval was achieved by meeting the strict project requirements.
|
 |
|
|
News 10 New HDPE Grout Port Connection for PT Steel Ducts
PESTEC has developed a connection between HDPE and corrugated
PT steel ducts for professional look and performance to avoid
standard methods of sealing and taping of port vents in the future.
Installation is easy and fast. It needs just to drill a hole into the steel duct,
to heat up the HDPE grout port same as in our well experienced
grout port welding system, to fix heated grout port in the steel duct
and to spread it by using our special tool. The HDPE grout port is tight
and tough fixed in the hole and can not be removed.
Standard spiral corrugated vent pipe 21/28 mm can be connected
to the grout ports. Modified grout ports to fit to smooth vent ducts
or other customized solutions can be offered.
|
 |
|
|
News 9 New NOFX HDPE Electro fusion Coupler now in sizes up to 630 mm
Best quality moulded electro fusion couplers in NOFX HDPE colored material
including bar code label to use with all kind of universal electro fusion
welding equipments.
Available in all colors of our big color variety and produced of best uv- and
material stabilized NOFX HDPE color to match with our NOCX pipes.
The electro fusion coupler are designed for possible butt welding to pipe
if considered to use as telescopic sleeve. Perfect function and tightness
either if manufactured with sliding performance property.
Of course successful tests acc standard e-fitting tests have been achieved.
Available in all standard sizes 110-630 mm in SDR 11-32 as well as in all
special sizes on request.
Please note minimum order quantity of 50 pc. required.
For quantities less than 50 pc. we still provide our individual manufactured
special NOFX electro fusion coupler in sizes up to 315 mm in SDR 17-32.
|
 |
|
|
News 8 New Butt Welding Quality Test Comparison
PESTEC performed a new test comparison of welded versus
non welded NOCX pipes quality.
PESTEC butt welding requirements are to reach 100% of initial
non welded pipe quality in yield stress and tensile strain at yield
with a tolerance of +10% / -5% only.
This requirement far exceeds the norm requirement of 80% only.
The test results of +2,75 / -4,5 fully comply to our PESTEC
requirements.
As a conclusion for static and quality reasons it is to assume,
that non welded NOCX pipe sections are of same quality as
the butt
welded
NOCX pipe sections.
|
 |
|
|
News 7 New HDPE Grout Vent Port with NPT Thread
New Grout Vent Ports with NPT Thread are now also available
in HDPE color black.
By professional fast and easy connection Grout Vent Ports are
weld
to
HDPE PT Ducts with either smooth or corrugated design
for rigid
and tight connection with NPT threaded
high pressure grouting pipes.
The Grout Vent Ports are weld to the ducts using small
and lightweight
PESTEC welding equipment with professional installation design
and
avoid any taping or sealing known from other connection systems.
HDPE Grout Ports NPT comply to ASTM D 3350 PE 345444 C material
norm as well to FIB technical report bulletin 7 and FDOT PT
recommendations Section 462 requirements.
Welding is in accordance
with fusion
welding
norms ASTM D 2657 and DVS 2207 part 2. |
 |
|
|
News 6 Raw Material Price Update and Forecast
Following the crude oil price stabilization during last 4 month the
crude oil based
ethylene as the basic material of polyolefin raw
materials like HDPE and PP
did perform with little increase anymore.
We forecast raw material price stabilization during the next couple of
month even raw material suppliers announce still price increases
during that time.
The ethylen cracker capacities are still limited versus demands,
so price decrease
cannot be expected.
PESTEC keeps watching closely the price trend to stay in the
position
to offer 3 month quotation validity to support our customers
with
confirmed purchase prices
during tender periods.
|
 |
|
|
News 5 OIT Test for IP 3 PE and PP ducts acc
PTI requirements passed
We successfully passed OIT test executed at independent german
laboratory acc ASTM D 3895 performed on our IP 3 PE and
PP ducts acc. Latest PTI requirements to provide valuable
characterization parameter for evaluation of the polymer
long term stabilities
- 462 – 4.2.5.5 and 4.2.3 for corrugated ducts and
system components like inlets, outlets, valves and
plugs made of PE or PP for minimum 20 minutes
- 462 – 4.2.5.6 for smooth PE ducts for minimum
40 minutes
We want to point out that the test ducts are taken from standard
production using PESTEC HDPE and PP standard materials
not containing any special metal deactivator additives.
Metal deactivator additives can increase short time OIT results
without providing any long term property increase or advantage.
|
 |
|
|
News 4 17000 m IP 3 M PP Duct for new HSL - High Speed
Rail Station in Antwerp, Belgium
To protect both sides of the 2500 m long and 10 m high facade of the
railway approach of historical Antwerp Railway Station from year 1905
still in operation today, the new HSL - High Speed Railway Station is
designed on underground levels under the present rails.
Construction method are tunnel works using prestressed beams and
excavate the ground part by part to reach -2 level underground.
More than 17000 m PESTEC IP 3 M PP Duct of sizes ID 85 and ID 100
have been installed for corrosion protection of internal post-tensioning
of the beams. To complete the corrosion protection system,
PESTEC PF duct couplers, grout ports welded to the ducts, as well as
vent pipes, valves and end caps have been used for perfect grouting.
IP 3 Duct approval was achieved by meeting the
strict project requirements. |
 |
|
|
News 3 New contract for biggest stay pipe size ever used on
a Cable Stay Bridge
We proudly received the first contract worldwide using OD 400 mm
HDPE pipe to cover the biggest stays ever used.
7000 m NOCX HDPE pipe OD 400 mm SDR 21 including external spiral
in grey color will be installed on a US bridge in the state of Maine
starting April next year.
For this new size a new tool for the external spiral needs to be
produced.
We will also supply several components in the same grey color to
complete the system.
Our very well matured pipes, already providing extraordinary features
in uv stability, heat and micro crack resistance on more than
100 projects worldwide for very competitive price, were chosen from
the project designers, project engineers as well the subcontractor
as the most efficient and economical solution to protect the strands
and cover them long term in favourable design.
Thank you to our customer for this contract as well as for the
extension of our product line !!! |
 |
|
|
News 2 New Colored External Spirals for individual
NOCX stay pipe color design
Choice of more than 200 colors including metallic effect colors are
available according to our color chart and can be mixed with any pipe
color for individual stay pipe design e.g. in national colors,
State colors or colors of province or city.
As an option the double spirals are offered in one or two
different
colors from the pipe color.
Colored external spirals are of same best NOCX HDPE quality
incl. uv stability, heat and micro crack resistance
and online welded to the pipes.
|
 |
|
|
|
News 1 Polyolefin raw material price explosions
since 6 month
Following the 80% crude oil price increase during last 12 month
the crude oil based ethylene as the basic material of polyolefin
raw materials increased at least by 59% and HDPE pressure pipe
grade raw material compound by 47% during the last 6 month.
This global price increase in addition is caused by limited ethylen
cracker capacities versus demands, as well in the situation that
the big producers as e.g. BP, Shell, Fina and BASF had inadequate
profits in the past and now focus on profit instead of quantity.
These price increases of course strongly influence our product prices
depending on the ratio of raw material versus production and
transport costs of each product. Injection moulded parts are much
less influenced by this price increase
than e.g. the standard solid
pressure pipes with dominant raw material factor.
PESTEC watch closely this price trend and still keep offering
competitive product prices in the future. |
 |