|
|
| |
|
News 61 White Color IP 4 HDPE Duct
White colored ducts get more and more specified for
projects
in hot destinations, versus standard black colored
ducts.
Temperature tests show up to 15°C lower duct temperature
during installation in summer and by this ducts keep higher
performance in longitudinal and lateral load performances
specially required during duct installation. White PESTEC IP 4 ducts are uv-stabilized and heat
stabilized
to keep their properties either by outside storage
until use. |
 |
|
 |
|
|
| |
|
News 60 Machined Fittings
PESTEC provides huge variety of customized non standard
fittings machined from hollow rods, pipes or sheets.
Multiple materials and colors are available.
Machining of OD, ID thickness, holes, screw threads,
trapezoidal gauges, grooves, slots, channels, radii and
more
are possible. |
 |
|
 |
|
|
| |
|
News 59 DHP HDPE Half Pipe used for Repair in
Singapore
DHP HDPE Pipes including heat shrink wrap sleeves have
been
successfully used for external tendon repair inside a
box girder
in Singapore for long term tight and protective
solution.
Easy, fast and professional application. |
 |
|
 |
|
|
| |
|
News 58 IP 4 Duct FDOT Raw Material Compliance
Test passed
PESTEC passed ASTM D 4101 cell class 340PP55662 raw
material
test
complying with FDOT spec for IP 4 PP ducts
used
in
internal
PT
applications.
The test was performed
at independent ARDL Lab in the USA.
View content:
TR 280-20-1 IP 4 PP Duct FDOT RM Compliance.PDF |
 |
|
 |
|
|
| |
|
News 57 New Colored Heat Shrink Pipe
Heat shrink pipes are now also available in colored version
e.g. white, so following architecture design requirements
for visible constructions. Technical properties remain the
same
as
black heat shrink pipes. On request colored heat
shrink
pipes
are available with similar uv-protection as
our
NOCX
pipes.
Heating of colored heat shrink pipes is
recommended
using
a heat gun instead a flame gun
to
avoid
colored fire
spots.
Final shrinkage result is
the
same,
just
shrinking time
is
little longer. |
 |
|
 |
|
|
| |
|
News 56 Grout Port Stress Test passed
PESTEC passed ASTM F 2136 Notched Constant Ligament
Stress Crack Test min 65 hours complying with FDOT
for
PESTEC PP grout ports and 20 hours for PF PE
couplers.
The test was performed at independent
TRI
Lab in the USA.
View content:
TR 254-19-1 PP Grout Port Stress Crack.PDF |
 |
|
 |
|
|
| |
|
News 55 Heat Shrink Pipe Selection Guide List
PESTEC present a new selection guide list for heat shrink
sleeves
and pipes showing suitability for the different
applications.
View content:
TI 920-1 HDPE Heat Shrink Pipe Selection Guide
List.pdf |
 |
|
 |
|
|
| |
|
News 54 Independent Expert Review on NOCX
pipe
UV-Test Results
PESTEC present an independent expert opinion on the
reliability of
the different accelerated laboratory
weathering
tests executed on
PESTEC NOCX ducts
during last 20 years.
In addition the author comments
on PESTEC durability
predictions
and color
recommendation charts.
See detailed report:
Independent Expert Review of weathering results |
 |
|
 |
|
|
| |
|
News 53 New Grout Port Drill Tool for
small
sized Ducts
PESTEC offer new drill tool to be used for all size of
PT ducts
including small size ducts.
|
 |
|
 |
|
|
| |
|
News 52 New IP 4 Duct Size 36/46 mm for 3
strands
round
PESTEC introduce new IP 4 Duct Size 36/46/2.0 mm to use
for 3 strands
round where no flat duct can be used.
All accessories like PF and PFS couplers are available and
also still our
grout port system works for this small duct
size.
Ducts also can be connected by butt welding using
our
IP 4 butt welding
equipment.
Of course ducts comply
with FIB 7 and PTI specifications.
PESTEC also prepares for new IP 4Duct Size 44/54/
2.0mm
to use for
4 strands round.
|
 |
| |
 |
|
|
| |
|
News 51 New Inflatable Rubber Hose
PESTEC introduce new Inflatable Rubber Hoses to use as
temporary
internal bonded PT pipe stiffener during
concreting of segments and
structures designed in sizes.
where concrete load can not anymore
taken by the plastic
duct themselves.
Inflatable Rubber Hoses are available in sizes 25-250 mm
with wall
thickness of 8-15 mm. They are expandable 15-25
mm depending
on size and may be used for min 200 times
at max elasticity.
Max available length is 30 m and hoses
include steel end cap at one
end and end cap with
automotive tire valve to fill with 3-4 bar air at
the other end.
|
 |
| |
 |
|
|
| |
|
News 50 118.000 m IP 4 Duct for Diaphragm Wall
PT
in Dubai
PESTEC has started to supply 118.000 m IP 4 duct system
contract for new
Canal link to Dubai Creek constructed by
diaphragm wall cages strengthened
by internal bonded PT
method.
The new system consists of 100/116 mm ducts, heat shrink
pipe and
steel bends.
The total installation period is estimated for 16 month.
|
 |
| |
 |
|
|
| |
|
News 49 New SB 4 Coupler For Precast
Segmental Bridges
PESTEC introduce our SB 4 Coupler System for
pressure and corrosion tight plastic duct connection of
internal bonded post tensioning tendons
in pre-cast
segmental structures.
Our SB 4 coupler available in HDPE or PP comply to
FIB 7 specification
and is designed to cover a maximum
segment to segment installation
tolerance of 50 mm
caused e.g. by part tolerances, duct elongation,
temperatures, pipe cutting and welding or formwork
and segment to
segment gap.
Suitable for corrugated PESTEC IP 3 and IP 4 ducts for
internal PT and
smooth PESTEC EP ducts for external PT.
Also suitability with other
corrugated ducts for internal PT
upon request.
SB 4 coupler systems consist of 2’Outer Couplers’, 1’Inner
Coupler’,
1 Sealing No 1, 1 Sealing No 2, 2 end caps for
temporary and multiple use.
All PESTEC IP 4 duct sizes ID 58 – 140 mm are available.
Other sizes on request.
PESTEC offers several options for SB coupler delivery
either prefabricated
segment ducts on final length
consisting
of IP 4 duct including mirror
welding of ‘Outer
Couplers’ or
just the couplers separately for site welding.
Delivery of
ducts
in standard lengths and SB couplers
separately for
site
Welding.
See detailed information: SB 4 Coupler Data Sheet.PDF
|
 |
| |
 |
|
|
| |
|
| News 48 Huge Raw Material Price Increases
Following the crude oil price increase during last months the
crude oil based
ethylene as the basic material of polyolefin
raw materials like HDPE and PP
pressure pipe grades
increased
by 34% since February 2008.
Most PESTEC products are made of these materials to
comply
with
the application specifications and standards.
Due to worldwide limited suppliers offering pressure pipe
grade
raw materials
sales prices are very similar and so
are
not
subject
to the high competition
of mass PE grades
like for
packing and foils.
For this reason and our experiences, even if the oil price
may
drop
again,
we expect more or less stable prices on
this high
level in the
near future. |
 |
| |
 |
|
|
| |
|
News 47 New PESTEC Branch Office in
New Delhi - India
PESTEC established a branch office in New Delhi, India
under
the name of PESTEC India PVT. LTD.
The staff will cover the project management for local
India
projects
as well manage PESTEC products production
facilities
in India.
Pricing and technical support either for India clients will
be
still
offered from German office.
(Picture of Taj Mahal is presented with a thank you to
India
and not
showing PESTEC India new office location.) |
 |
| |
 |
|
|
| |
|
News 46 120.000 m EP 1 Duct System for Jebel
Ali
Palm Bridge in Dubai
PESTEC has started to supply 120.000 m EP 1 duct system
contract for new Jebel Ali Palm Main Bridge constructed by
external post-tensioning method.
The system consists of 140 mm ducts, expansion sleeves,
heat shrink pipe Couplers, grout port welding system and
vent pipe fittings for injection.
The total installation period is estimated for 14 month.
EP 1 Duct system approval according to FIB. |
 |
| |
 |
|
|
| |
|
News 45 New ultra high pressure pipe up to 150 bar
PESTEC introduce new UHP HDPE pipe for ultra high
pressure up to 150 bar.
For use in water injection, oil well
hook-up lines, flow lines in buried, offshore
Onshore/under
water installation or gas distribution.
UHP pipes consist of a 3 layer system of inner HDPE PE 100
liner, mid layer of synthetic fibre and cover layer of uv-
stabilized PE 100 material and are
available in 3 types
UHP-S, UHP-M and UHP-L depending on pressure rate and
medium temperature.
UHP pipes are available in sizes ID 100 and 125 mm,
supplied in 400 m coils
and connected by special couplers
and flanges.
The advantages are more easy, efficient and effective
installation of
up to 1000 m/day either offshore or onshore,
high flow capacity due to lower
friction, so 5’ pipe has same
flow rate than 6’ steel pipe and of course the well
known
fully corrosion resistance.
Max service pressure and temperature depend on flow
media in ranges
for water 36-150 bar, for hydrocarbon
fluids 26-65 bar and gas 25-42 bar.
Offshore installation depth depending on media 65-900 m
under water.
UHP pipes are produced according several international
standards and are
Also certified from several institutes. |
 |
| |
 |
|
|
| |
|
News 44 Material Safety Data Sheet
for
HDPE products
PESTEC present latest MSDS for HDPE products with
the
intention to provide Health and Safety information
mainly
for
the case of fire.
Even if HDPE is not regulated as hazardous or dangerous
good
for any kind of transport, storing or for installation,
and so can
be
handled without any special care we want
to
inform about
Emergency and First Aid measures
as well as
Fire and Explosion
Hazard Data of this material.
View content: HDPE MSDS. PDF
|
 |
| |
 |
|
|
| |
|
| News 43 New Leak Tightness Test Set
PESTEC introduce new Leak Tightness Test Set suitable to
test leak tightness of duct and pipe systems installed for
various applications.
The set is suitable to tests pipe ID 70-150 mm (3-5 inch)
with both smooth or corrugated inner surface design
for max 0,25 bar (3,5 PSI) according EN 1610 or
FIB Bulletin 7, Chapter 4.2 Clause 2.
The ‘all in’ test equipment set consists of a pneumatic
dead end
and a bypass plug to be inflated by an included
compressor, filling air
with 7,5l/min at max. 11,5 bar,
an equipment adaptor including
air outlet and a digital
pressure gauge test equipment
(resolution 1,bar.
The Leak Tightness Test Set is available for rent and sale.
|
 |
| |
 |
|
|
| |
|
| News 42 IP 4 Duct Full Scale Test
54 m long and 2,65 m high Full Scale Test has been
successfully performed with big sized
ID 130 mm IP 4 M PE Ducts.
4 Tendons 6-43 have been concreted, grouted and stressed
and all results for friction, wobble, tightness, loads and
filling grade have been within the required and specified
FIB 7 and TR 47 values.
|
 |
| |
 |
|
|
| |
|
| News 41 HDPE Welding Rod with new packing
PESTEC HDPE PE 80 and PE 100 welding rods now are
packed on environmental friendly paper drums additional
thin plastic protection foil.
2,4 Kg round profile welding rod is available in 3,4 and
5 mm on our new drums.
Paper drum sizes remain unchanged to fit to welding
supports as before and can get environmental friendly
and easy waste,
so special plastic disposal like for
previous plastic drums can be avoided. |
 |
| |
 |
|
|
News 40 ETA – ETAG 013 Application for IP 4 Ducts
PESTEC applied for ETA approval of our IP 4 Duct for use
in internal bonded post-tensioning structures.
As according ETAG 013 regulations ducts are only part of
the complete system and so do not cover the approval of
plastic ducts alone, PESTEC applied for an individual so
called ETA approval of our IP 4 ducts.
Due consents of all EU members are required the duration
for the approval is assumed to take 6-9 month. |
 |
| |
 |
|
|
| |
|
News 39 Pipe Surface Cleaning Methods
PESTEC presents a new recommendation for possible
pipe surface cleaning processes depending on kind of
contamination materials and grade.
View content: Pipe Surface Cleaning Methods. PDF
|
 |
| |
 |
|
|
| |
|
News 38 Quality PVDF pipe and fittings for lowest
market price
PESTEC proudly introduces new PVDF liner and pressure
pipe systems.
We use original state of the art Kynar resin from the market
leader Arkema – USA to produce first class PVDF pipes and
fittings according ISO 10931-05 and quality approved to be
Kynar labled
from Arkema.
Sizes OD 20 to 200 mm for lining and for pressure
applications PN 10
and PN 16 are available.
To complete the pipe system all standard fittings like
elbow 90°,
equal tee, socket, reducer, end caps and valves
are
on stock and
special fittings are available on request
as well known from PESTEC.
Each pipe is individually wrapped in foil and perfect packed
to avoid transport damages.
Last we announce the biggest advantage of
PESTEC PVDF
pipes:
We offer lowest market price approx. 15% lower than our
competitors.
Challenge us !!! |
 |
| |
 |
|
|
| |
|
| News 37 New IP 4 Duct Butt Welding Equipment
PESTEC introduces the brand new IP 4 Duct Butt Welding
Equipment P 160
for fast and easy butt welding of our
IP 4 ducts.
The low weight very portable all in one equipment with
a
weight of 27 Kg only
includes all special clamp sizes
for all IP 4 ducts 74, 92, 116,131,146 and
157 mm.
Both materials HDPE and PP and also all available IP 4 duct
wall thicknesses can be weld together based on international
welding norms.
Of course planar and heating element are also included
and the equipments
work at standard 220-230 Volt.
The IP 4 Duct P 160 Butt Welding Equipments are available
to purchase or on rental basis. |  |
| |
 |
|
|
| |
|
News 36 115.000 m IP 4 Duct for Bangalore
elevated Expressway
PESTEC has started to supply first quantities of total
115.000 m
IP 4 100 mm
duct for new Bagalore elevated
Expressway
constructed by segmental bridge
method.
The pipes are supplied in fixed length and connected
using
our PF couplers
and the total installation period
is
estimated
for 14 month.
IP 4 Duct approval according to Indian IRC 18 was
achieved
by verification
tests. |
 |
| |
 |
|
|
| |
|
News 35 PESTEC connected VOIP
PESTEC now also to reach VoIP by Skype.
Contact us under:
Pestec.Holger.Jung
and save communication costs with us.
|
 |
| |
 |
|
|
| |
|
News 34 Longest USA Stay Cable Bridge
approaching ‘In harmony with nature’
PESTEC NOCX pipes will be used on new Audubon Bridge
crossing Mississippi
river near Baton Rouge in Louisiana.
More than 20000 m stay cable pipes for the 482 m main
span bridge with the 2x
153 m pylons are needed.
Owners and designers approach is to design the bridge
similar to the
approach of 19th century local residing, very
renowned artist
John James Audubon, who dedicated his
life
to paint all of the birds in America
also valuing smallest
details and their relationship to the surrounding
environment.
Mr. Audubon inspired the engineers to the goal to ensure
the bridge is
not built in a vacuum, so rather to get an
integral part of the surrounding landscape.
So the theme selected for this project is ‘In harmony with
nature’.
The stay pipe color is burnt umber, a common color found
in the birds native
to this area and has the advantage to be
even visible to the travelling public
against cloudy or hazy
sky, so at all weather conditions.
PESTEC is proud to supply their NOCX pipes for this bridge
‘In harmony with nature’. |
 |
| |
|
|
|
| |
|
News 33 New FR 1 PP pipe system to comply
with
highest fire resistance class
PESTEC introduce the fire resistant FR 1 PP pipe with
outstanding properties as the first real plastic option to cast
iron, e.g. to use for drainage and sewage in public and
private buildings, sanitary, aggressive fluids or in outside
use like drainage of bridges and roofs.
The pipes are made of advanced self-extinguishing PP and
have been classified to fire behaviour index Euro class B1
acc. EN 13501-1:2002 means for low contribution to spread
fire.
Smoke production index is S3 means average level of
smoke production and Burning droplets index is d0 means
absence of burning particles.
The material properties provide highest strength even at
lowest temperatures, high resistance against impacts and
atmospheric agents and of course all other well known
excellent properties of Polypropylene.
A side effect is also the outstanding sound absorption.
The pipe system is available in sizes 58-200 mm and pipes
and complete fitting variety are supplied with a Push Fit
Coupler including a new double lip seal with perfect
hydraulic properties.
|
 |
| |
|
|
|
| |
|
News 32 New ultra low friction ULF Duct for
Fibre Optic Cables
PESTEC introduce improved ultra low friction HDPE duct
for fibre optic cable
Protection.
The friction coefficient of the new inner layer has been
reduced to outstanding
low < 0,06 between sub-duct and
cable using an improved inner silicon layer.
The advantages are more easy, efficient and effective
installation of fibre optic
cables stress reduction of the
cables and possible longer installation lengths with
less duct connectors needed and faster installation with
less manpower.
The general duct design keeps the same with co-extrusion
layer of high quality
HDPE material with excellent long-term
properties outside and the new
solid wall special low
friction silicon layer inside (minimum 10% of total wall
thickness).
Also the sizes remain the same with OD 32, 40 and 50 mm.
Coil length 500 – 1000 m. Various colours are available
according request.
|
 |
| |
|
|
|
 |
|
News 31 New IP 4 Duct for bonded post-tensioning
available now
PESTEC introduce new IP 4 Duct for bonded post
tensioning.
The design is very similar to our IP 3 duct and meets
latest FIB 7 specifications.
The sizes are slightly modified, so now we offer e.g.
100/116 mm, 115/131 mm.
76/92 mm and 58/74 mm.
IP 4 Duct is available in HDPE and PP and also in
different wall thickness’
to comply with all kind of project
specification as well as our clients economical
target.
All kind of components well known from IP 3 are also
available for IP 4.
FIB7 and FDOT tests are prepared for execution during
the next 2 month,
and due to successful IP 3 Duct test
we trust to pass also with the new IP 4 duct.
A new production line with big capacity for IP 4 duct has
been established in India.
One big advantage now is the very short production lead
time of just 1 week,
so in the future we can also serve
projects within delivery times of approx. 4 weeks
depending on the location.
First 115000 m order of size 100/116 are in production
for Bangalore Expressway. |
 |
 |
|
|
|
 |
|
News 30 New Rubber Material for Exposed Use
in
Civil Structures
PESTEC introduce advanced PUR HMD polyurethane quality
optimized for hydrolyse resistance microbe-resistance, low
temperature resistance
by also absorbing dynamic stresses
in outdoor use.
First advantage is a new production technology for this
material needing
More simple tools only and so saving high
injection tool costs as needed for
other material. Either
small quantities of individual shapes, e.g. like
for stay cable
boots, now can be offered for affordable prices.
Second advantage is the availability of a big variety of
colors.
Compared with CR – polychloroprene (common brand
name Neoprene)
and CSM – chlorosulfonated polyethylene
(common brand name Hypalon)
our PUR HMD material
provide excellent weather resistance in black color
and good weather resistance in other colors where CR and
CSM only reach
medium to good results.
While wear resistance of PUR HMD is better, all other
mechanical properties
like tensile strength, aging, ozone,
abrasion, temperature range and
compression set are
very similar with CR and CSM. |
 |
 |
|
|
|
 |
|
| News 29 Gel-Epoxy for Perfect Corrosion Protection
PESTEC’s Visco elastic gel of epoxy polymer is an invention
for long term
corrosion protection of high performance
materials in civil structures.
The material has been successfully used on several projects
e.g. for stay cable anchor protection.
Special formulated Gel Epoxy resin and hardener
components are mixed at ambient temperatures, easily
injected to smallest cavities because of it’s
high viscosity
( like water) with low pressure during 12-24 hours and
cross linked during polymerization to a visco elastic
polymer with
adhesive properties as well as damping
properties to the system.
Perfect corrosion protection has been approved by several
tests,
e.g. 3 month exposure in salt spray test and salt-
water immersion test
as well temperature test. In addition
PESTEC Gel Epoxy provide excellent
alkaline resistance
during 6 month cement grout compatibility test and
excellent mechanical behaviour in cycle thermal test.
It was further approved to stop started corrosion at it’s level.
Other benefits are volumetric material shrinkage, no
material diffusion to
other materials and no temperature
increase
during polymerization. |
 |
 |
|
|
|
 |
|
| News 28 Wind Tie Connectors for Stay Cables
PESTEC supplied special connectors in pipe color to connect
additional wind tie rods to NOCX HDPE stay pipes for a
project in the USA.
The wind tie connectors are made of same colored HDPE
material and supplied
in half shells to be attached at final
optimized position by integrated
electro fusion welding
method already well experienced for a lot of other
components as well as repair parts for stay cables
The design has a groove to take the metal steel clamp of
the tie rod for
perfect function as well as good appearance
for the whole cable. |
 |
 |
|
|
|
 |
|
| News 27 Raw Material Prices stable on high level
Following the crude oil price increase during last months the
crude oil based
ethylene as the basic material of polyolefin
raw materials like HDPE and PP
now seems to keep stable
on high level.
Raw material suppliers already set up prices by 25% from
starting this year
and currently do not announce further
increase.
The ethylen cracker capacities are back to full operation,
but
due to high
demands we expect stable prices for next
half
year by no price decrease
in the near future.
|
 |
 |
|
|
|
 |
|
| News 26 Glossary of HDPE Pipe terminology
PESTEC present a glossary of terms with the intention to
provide definitions for specific words and expressions
currently used
by the plastic pipe industry or are related
to the manufacture,
installation and use of polyethylene
pipe for different applications.
View content:
Glossary of HDPE Pipe terminology. PDF |
 |
 |
|
|
|
 |
|
News 25 Dark Blue Metallic Effect colored
NOCX
pipes
New dark blue metallic effect colour has been chosen to
underline
the bridge design and durable protection of the
stay cable structure
of a bridge in the Czech Republic.
PESTEC also provides the HDPE system components in the
same
color to complete the system.
Since a couple of years more and more bridge designers
go for
metallic effect colors like silver or gold and now blue.
Our experiences, references as well as our outstanding uv-
test results either for metallic effect colored NOCX pipes
convince the
project designers, project engineers as well
the subcontractors to
decide for metallic effect color.
Thanks to our customer for this contract !!! |
 |
 |
|
|
|
 |
|
News 24 White DHPS Half Pipes for Stay Cable with
Fire Blanket
First use of our DHPS Half pipes with incorporated
longitudinal sealing
for a project in La Reunion with special
fire protection requirement.
Half pipe color will be white.
PESTEC uses the same well
developed and
tested white
NOCX color we also used for
several projects for
solid pipes.
Our Half pipes will be installed over the bundles of HDPE
coated strands
which are covered with special 10 mm
double layer fire protection blankets.
The fire protection
blankets did pass the required 1000 °C
hydrocarbon
fire test with a duration of 1 hour by keeping
the steel
strand temperature
less than 100°C.
Installation will be made by pressing the half pipes
together
and using our
click system and lock them in
position. Full
strength radial joints are secured
by butt
welded using our
special half pipe butt welding equipment.
To complete the system, special components to connect
the half pipes to
pylon and deck will be supplied from
PESTEC. Our experiences and references convinced the
project
designers and
project engineers to choose our
half pipes
for this special application. |
 |
|
|
 |
|
News 23 Information on new UV-Test
PESTEC present updated detailed test information on
a
uv-test called
SEPAP and which we noticed in some
project specifications in the past.
Focus is the prediction of long term polymer stabilization
based on extreme short time acceleration.
We did test our NOCX pipes in this test 2 times in the past
and
due to the partly different test results versus our
standard Xenotest
and WOM tests we searched for the
reasons therefore.
SEPAP test did not reach international acceptance up to
now and has
not been approved from experts for an
international norm.
Main reasons seem to be the use of non-natural light
radiation with
very high energy causing molecule
absorptions, polymer and
additive damages and
excessive polymer oxidation.
See detailed information:
SEPAP Test Information.PDF
PESTEC propose to stay
with the reference standards
Xenotest and
WOM Tests
according international
accepted ISO and ASTM norms
as reference tests for
accelerating photo-aging test for
long term uv-stability
prediction of HDPE pipe products. |
 |
| |
|
|
|
 |
|
News 22 Review on FIB 2006 Congress
PESTEC thank you for visiting our exhibition stand on
second FIB 2006
Congress in Naples. It was a pleasure
to meet you to show our
new products, to discuss product
details or just to have an espresso
with you.
Your interest in our actual product range for stay cable
protection,
external and internal post-tensioning applications
as well as ground
anchor protection and your expressed
satisfaction that we provide
complete systems including
detailed technical support motivate us to
proceed with our
philosophy.
Your given ideas will support us on detail improvement
in
the future.
PESTEC look forward to our customers and interested
people
challenges on future projects. |
 |

|
|
|
|
 |
|
News 21 FIB 2006 Congress Naples - Italy
PESTEC invite all our customers as well as all interested
people
in our products to visit our exhibition stand for
a small and strong
Italian espresso coffee on second
FIB 2006 congress in
Naples/Italy from 5-8th of June.
We are going to present our actual product systems
variety for
stay cable protection, external and internal
post-tensioning
applications as well as ground anchor
protection.
PESTEC look forward to meet you and discuss detailed
production information. |
 |
|
|
|
|
 |
|
News 20 New CIC 4 HDPE Ground Anchor Duct
After introduction of CIC 3 flat corrugated design anchor
duct just 2 months ago now we introduce as well our new
CIC 4 HDPE ground Anchor Duct with new thick wall
circular high corrugations and improved bond behaviour
for excellent corrosion protection of permanent ground
anchors.
Our new CIC 4 HDPE Anchor Duct is available in a wide
size range of ID/OD 38/50 to 148/175 mm.
The duct is available in wall thickness classes 1,5 and
2,0
and 2,5 mm.
CIC 4 HDPE Ground Anchor Ducts have standard straight
length of 5,8 m and in sizes up to 100 mm either in coils
up to 100 m.
Other lengths on request.
Jointing is recommended with heat shrink sleeves. |
 |
|
|
|
|
 |
|
| |
|
News 19 New FKS PEG Pressure Pipe
New extra large diameter HDPE pressure pipe for main
application of raw and potable water supply.
The development of a new HDPE raw material compound
containing fibre snippets enables us to offer the unique
FKS PEG Pressure Pipes which are available in sizes
1000 – 4000 mm for pressure resistance up to 10 bar in
stiffness classes 2 – 12 SN according ISO 9969.
FKS PEG Pressure Pipes have solid wall and smooth inner
and outer surface ensures best hydraulic properties and
the outstanding HDPE properties ensure best chemical
resistance and low abrasion.
Our new FKS PEG Pressure Pipes are jointed with the
well-established electro-fusion socket.
All kind of fittings as bends, elbows, reductions and flanges
are available.
The production is based on the well experienced
FKS profile pipe production. |
 |
|
|
|
|
| |
|
| |
|
News 18 New CIC 3 HDPE Ground Anchor Duct
New corrugated HDPE Duct for excellent corrosion
protection of
permanent ground anchors.
New circular flat corrugation design in common anchor
sizes of ID/OD 54/64, 68/78, 89/98 mm.
Wall thickness available in 1,5 and 2,0 mm.
CIC 3 HDPE Ground Anchor Ducts have standard straight
length of 5,8 m or are available in coils up to 200 m.
Other lengths on request.
Jointing is recommended with heat shrink sleeves.
We produce our new CIC 3 Ducts in Europe,
so delivery
time is just about 2 weeks. |
 |
|
|
|
|
News 17 New PFS Sealing for IP-3 Duct PFS
Couplers
New PFS sealing design for improved PFS coupler tightness
on IP-3 duct system.
The sealing is designed to clamp the IP-3 duct in perfect
position, so pipe removal is possible using a special
removal tool only.
Tightness tests acc FIB recommendation bulletin 7 for air
tightness of 0,3 bar for minimum 5 minutes have
successfully passed without loss.
So the PFS coupler is offered as a good option for the
tight Connection of our IP-3 Duct in internal Post
tensioning applications and might save the installation
costs and installation time of additional heat shrinks
sleeves or heat shrink pipes. |
 |
|
|
|
|
News 16 Orange DHP Half Pipes for
China Stay Cable Bridge
We proudly announce the supply contract for Nan Chong
Cable Stay Bridge in China now built using PESTEC DHP
Half pipes in orange colour.
PESTEC also provides the special half pipe welding
equipment and spacer system to complete the system.
Our experiences and references convinced the project
designers and project engineers to use again our
half pipe system in China.
Thank you to our customer for this contract !!! |
 |
|
|
|
|
News 15 Stay Pipe Repair Coupler systems
Swinging cables during high wind crashed against street
lamps on Dubrovnik Bridge, Croatia and smashed the
NOCX-HDPE pipes in about 10 m height in sections of
about 60 cm.
The smashed sections were carefully cur out using a
special circular saw with adjustable height to avoid
cutting into the inner HDPE coated strands and our special
electro fusion half pipe repair couplers of same stay pipe
colour were successfully installed.
Our repair coupler system is designed to replace the
original stay pipe section by taking the same calculated
loads of pipe and welding forces. |
 |
|
|
|
|
News 14 South Africa goes for IP-3 M PP Duct
First delivery of plastic duct for internal Post-tensioning
in South Africa for
about 11000 m of IP-3 M PP have been
delivered for Uli-Ilangeli project.
Pipe connections were made using PF couplers.
IP 3 Duct approval was achieved by meeting the strict
project requirements.
|
 |
|
|
|
|
News 13 Increasing Raw Material Prices
Following the crude oil price increase during last months
the crude oil based
ethylene as the basic material of
polyolefin raw materials like HDPE and PP
increase by
nearly 20% during the last 3 month.
Raw material suppliers already set up prices by 15% by
end of September
and allready announced another 10%
for October.
The ethylen cracker capacities are still limited versus
demands,
so price decrease in the near time cannot be
expected.
Since the raw material part of the final PESTEC product
sales price
depend a lot on the kind of production, the
necessary price increases
vary for each product line.
To support our customers as much as possible for their
tenders
and projects by lowest possible price increases,
PESTEC will limit them
to the raw material part only.
PESTEC apologize for the need to limit the validity of
new quotations
to 1 month from now on until the market
will relax again. |
 |
|
|
|
|
News 12 Silver coloured NOCX pipes for
Green Bridge in Brisbane Australia
We proudly announce the supply contract for 2nd biggest
Cable Stay Bridge in Australia now built in Brisbane using
PESTEC NOCX pipes in
dark silver metallic effect colour
and of course including the state of the art
feature of
external helical ribs.
PESTEC also provides the HDPE system components as
transition pipes, coloured electro fusion couplers as well
as the
neoprene boots
to
complete the system.
Our experiences, references as well as our outstanding
uv-test results
either for metallic effect coloured NOCX
pipes convinced
the
project
designers, project engineers
as well the
subcontractor to go for
the
dark grey metallic
effect colour to underline the
bridge design and protect
the structure on long term at the
same time.
Thank you to our customer for this contract !!! |
 |
|
|
|
|
News 11 IP 3 S-PE Duct for Thread Bar Protection
in Abu Dhabi - UAE
To protect Thread Bars in post tensioning on
Sheikh Zayed Bridge to Abu Dhabi Island nearly 10000 m
of
PESTEC IP 3 S-PE Ducts are going
to be used.
Thread bars of 32, 40, 50 and 75 mm will be protected
with IP 3 S-PE Ducts in sizes up to 114/99 mm.
To complete the corrosion protection system, PESTEC heat
shrink couplers,
corrugated pipes to cover the thread bar
couplers and special PE reductions
including grout ports
will be used.
IP 3 Duct approval was achieved by meeting the strict
project requirements.
|
 |
|
|
|
|
News 10 New HDPE Grout Port Connection for
PT Steel Ducts
PESTEC has developed a connection between HDPE and
corrugated PT steel ducts for professional look and
performance to avoid standard methods of sealing and
taping of port vents in the future.
Installation is easy and fast. It needs just to drill a hole
into the steel duct,
to heat up the HDPE grout port same
as in our well experienced
grout port welding system, to
fix heated grout port in the steel duct and to spread it by
using our special tool. The HDPE grout port is tight
and tough fixed in the hole and can not be removed.
Standard spiral corrugated vent pipe 21/28 mm can be
connected
to the grout ports. Modified grout ports to fit
to smooth vent ducts or other customized solutions
can be offered.
|
 |
|
|
|
|
News 9 New NOFX HDPE Electro fusion Coupler
now in sizes
up to 630 mm
Best quality moulded electro fusion couplers in NOFX HDPE
colored material
including bar code label to use with all
kind of universal electro fusion
welding equipments.
Available in all colors of our big color variety and produced
of best uv- and
material stabilized NOFX HDPE color to
match with our NOCX pipes.
The electro fusion coupler are designed for possible butt
welding to pipe
if considered to use as telescopic sleeve.
Perfect function and tightness
either if manufactured with
sliding performance property.
Of course successful tests
acc standard e-fitting tests have been achieved.
Available in all standard sizes 110-630 mm in SDR 11-32
as well as in all
special sizes on request.
Please note minimum order quantity of 50 pc. required.
For quantities less than 50 pc. we still provide our
individual manufactured
special NOFX electro fusion
coupler in sizes
up to 315 mm in SDR 17-32.
|
 |
|
|
|
|
News 8 New Butt Welding Quality Test Comparison
PESTEC performed a new test comparison of welded
versus non welded NOCX pipes quality.
PESTEC butt welding requirements are to reach 100% of
initial
non welded pipe quality in yield stress and tensile
strain at yield
with a tolerance of +10% / -5% only.
This requirement far exceeds the norm requirement of
80% only.
The test results of +2,75 / -4,5 fully comply to our
PESTEC requirements.
As a conclusion for static and quality reasons it is to
assume,that non welded NOCX pipe sections are of same
quality as the butt welded
NOCX pipe sections.
|
 |
|
|
|
|
News 7 New HDPE Grout Vent Port with NPT Thread
New Grout Vent Ports with NPT Thread are now also
availablein HDPE color black.
By professional fast and easy connection Grout Vent Ports
are weld to HDPE PT Ducts with either smooth or
corrugated design for rigid
and tight connection with NPT
threaded high pressure grouting pipes.
The Grout Vent Ports are weld to the ducts using small and
lightweight PESTEC welding equipment with professional
installation design and avoid any taping or sealing known
from other connection systems.
HDPE Grout Ports NPT comply to ASTM D 3350 PE 345444 C
material norm as well to FIB technical report bulletin 7 and
FDOT PT recommendations Section 462 requirements.
Welding is in accordance with fusion welding norms
ASTM D 2657 and DVS 2207 part 2. |
 |
|
|
|
|
News 6 Raw Material Price Update and Forecast
Following the crude oil price stabilization during last 4 month
the crude oil based ethylene as the basic material of
polyolefin raw materials like HDPE and PP did perform
with little increase anymore.
We forecast raw material price stabilization during the next
couple of month even raw material suppliers announce
still price increases during that time.
The ethylen cracker capacities are still limited versus
demands, so price decrease cannot be expected.
PESTEC keeps watching closely the price trend to stay in
the position to offer 3 month quotation validity to support
our customers with confirmed purchase prices during
tender periods.
|
 |
|
|
|
|
News 5 OIT Test for IP 3 PE and PP ducts acc
PTI requirements passed
We successfully passed OIT test executed at independent
german laboratory acc ASTM D 3895 performed on our
IP 3 PE and PP ducts acc. Latest PTI requirements to
provide valuable characterization parameter for evaluation
of the polymer long term stabilities
- 462 – 4.2.5.5 and 4.2.3 for corrugated ducts and
system components like inlets, outlets, valves and
plugs made of PE or PP for minimum 20 minutes
- 462 – 4.2.5.6 for smooth PE ducts for minimum
40 minutes
We want to point out that the test ducts are taken from
standard production using PESTEC HDPE and PP standard
materials not containing any special metal deactivator
additives. Metal deactivator additives can increase short
time OIT results without providing any long term property
increase or advantage.
|
 |
|
|
|
|
News 4 17000 m IP 3 M PP Duct for new HSL -
High Speed Rail Station in Antwerp, Belgium
To protect both sides of the 2500 m long and 10 m
high facade of the railway approach of historical
Antwerp Railway Station from year 1905 still in
operation today, the new HSL - High Speed Railway
Station is designed on underground levels under
the present rails.
Construction method are tunnel works using
prestressed beams and excavate the ground part
by part to reach -2 level underground.
More than 17000 m PESTEC IP 3 M PP Duct of
sizes ID 85 and ID 100 have been installed for
corrosion protection of internal post-tensioning
of
the beams. To complete the corrosion protection
system, PESTEC PF duct couplers, grout ports
welded to the ducts, as well as vent pipes, valves
and end caps have been used for perfect grouting.
IP 3 Duct approval was achieved by meeting the
strict project requirements. |
 |
|
|
|
|
News 3 New contract for biggest stay pipe size
ever used on a Cable Stay Bridge
We proudly received the first contract worldwide using
OD
400 mm HDPE pipe to cover the biggest stays ever used.
7000 m NOCX HDPE pipe OD 400 mm SDR 21 including
external spiral in grey color will be installed on a US bridge
in the state of Maine starting April next year.
For this new size a new tool for the external spiral needs
to be produced.
We will also supply several components in the same
grey color to complete the system.
Our very well matured pipes, already providing
extraordinary features in uv stability, heat and micro
crack resistance on
more than 100 projects worldwide for
very competitive price,
were chosen from the project
designers, project engineers
as well the subcontractor
as the most efficient and
economical solution to protect
the strands
and cover them long term in favourable design.
Thank you to our customer for this contract as well as for
the
extension of our product line !!!
|
 |
|
|
|
|
News 2 New Colored External Spirals for
individual NOCX stay pipe color design
Choice of more than 200 colors including metallic effect
colors are available according to our color chart and can
be
mixed with any pipe color for
individual stay pipe
design
e.g. in national colors,
State colors or colors
of province
or city.
As an option the double spirals are offered in one or
two
different colors from the pipe color.
Colored external spirals are of same best
NOCX HDPE
quality incl. uv stability, heat and
micro
crack resistance
and online welded to the pipes.
|
 |
|
|
|
|
News 1 Polyolefin raw material price explosions
since 6 month
Following the 80% crude oil price increase during last 12
month
the crude oil based ethylene as the basic material
of polyolefin
raw materials increased at least by 59% and
HDPE pressure pipe
grade raw material compound by
47% during the last 6 month.
This global price increase in addition is caused by limited
ethylen
cracker capacities versus demands, as well in the
situation that
the big producers as e.g. BP, Shell, Fina and
BASF had inadequate
profits in the past and now focus on
profit instead of quantity.
These price increases of course strongly influence our
product prices
depending on the ratio of raw material
versus
roduction and
transport costs of each product.
Injection moulded parts are much
less influenced by this
price
increase
than e.g. the standard solid
pressure pipes
with
dominant raw material factor.
PESTEC watch closely this price trend and still keep
offering competitive product prices in the future. |
 |